22
33## Status
44
5- Status: in-progress
5+ Status: completed
66
7- Sub-state: option A selected; PRs are being reviewed, refreshed, validated , and either merged or closed only when obsolete.
7+ Sub-state: all three Dependabot PRs were handled on ` main ` , remote validation passed , and the PRs are closed as obsolete.
88
99## Requirements
1010
@@ -177,13 +177,42 @@ Open decisions:
177177 - ` libc ` lock entry ` 0.2.183 ` -> ` 0.2.186 ` .
178178 - ` proptest ` lock entry ` 1.10.0 ` -> ` 1.11.0 ` .
179179 - ` rand ` lock entry ` 0.9.3 ` -> ` 0.9.4 ` .
180+ - Committed and pushed ` 6e27ee6 ` (` Apply Dependabot maintenance updates ` ) to
181+ ` main ` .
182+ - Verified GitHub Actions on pushed commit ` 6e27ee6 ` :
183+ - ` Dependabot Updates ` : success.
184+ - ` Supply Chain Security ` : success.
185+ - ` Runtime Safety ` : success.
186+ - ` CodeQL ` : success.
187+ - ` Codacy Local Analysis ` : success.
188+ - ` Static Analysis ` : success.
189+ - Verified GitHub Code Scanning open-alert count is 0 after the pushed state.
190+ - Closed PR ` #2 ` as obsolete because ` rand ` ` 0.9.4 ` is already on ` main ` .
191+ - Closed PR ` #3 ` as obsolete because ` libc ` ` 0.2.186 ` and ` proptest `
192+ ` 1.11.0 ` are already on ` main ` .
193+ - Verified PR ` #5 ` was already closed after the equivalent workflow updates
194+ landed on ` main ` ; manual close with a comment was not accepted because the PR
195+ was already closed.
196+ - Verified there are no open GitHub PRs after this maintenance.
180197
181198## Validation
182199
183200Acceptance criteria evidence:
184201
185- - Local ` main ` now contains the exact updates requested by PRs ` #2 ` , ` #3 ` , and
186- ` #5 ` ; final PR closure is pending push and remote validation.
202+ - PR ` #2 ` is closed, not merged, with ` closedAt `
203+ ` 2026-06-03T07:55:37Z ` ; its ` rand ` ` 0.9.4 ` update is present on ` main ` in
204+ ` 6e27ee6 ` .
205+ - PR ` #3 ` is closed, not merged, with ` closedAt `
206+ ` 2026-06-03T07:55:37Z ` ; its ` libc ` ` 0.2.186 ` and ` proptest ` ` 1.11.0 `
207+ updates are present on ` main ` in ` 6e27ee6 ` .
208+ - PR ` #5 ` is closed, not merged, with ` closedAt `
209+ ` 2026-06-03T07:51:25Z ` ; its GitHub Actions updates are present on ` main ` in
210+ ` 6e27ee6 ` .
211+ - ` gh pr list --state open --limit 20 ` returned an empty list.
212+ - Main workflow runs for ` 6e27ee6 ` all completed successfully:
213+ ` Dependabot Updates ` , ` Supply Chain Security ` , ` Runtime Safety ` , ` CodeQL ` ,
214+ ` Codacy Local Analysis ` , and ` Static Analysis ` .
215+ - GitHub Code Scanning open-alert query returned 0.
187216
188217Tests or equivalent validation:
189218
@@ -204,7 +233,9 @@ Tests or equivalent validation:
204233
205234Real-use evidence:
206235
207- - GitHub Actions validation is pending after push.
236+ - GitHub Actions ran on commit ` 6e27ee6 ` after push and completed
237+ successfully for all scanner and supply-chain workflows.
238+ - GitHub PR state now shows PRs ` #2 ` , ` #3 ` , and ` #5 ` closed and zero open PRs.
208239
209240Reviewer findings:
210241
@@ -215,6 +246,7 @@ Same-failure scan:
215246
216247- Current local OSV and Codacy scans reported 0 issues after applying the
217248 updates.
249+ - GitHub Code Scanning open-alert query reported 0 after the pushed state.
218250
219251Sensitive data gate:
220252
@@ -231,8 +263,8 @@ Artifact maintenance gate:
231263- End-user/operator docs: no update needed; no user/operator workflow changed.
232264- End-user/operator skills: no update needed; no public integration guidance
233265 changed.
234- - SOW lifecycle: implementation is in progress pending push, remote workflow
235- validation, PR closure, and final move to ` done/ ` .
266+ - SOW lifecycle: SOW is marked completed and moved to ` done/ ` with the final
267+ lifecycle commit .
236268
237269Specs update:
238270
@@ -253,23 +285,35 @@ End-user/operator skills update:
253285
254286Lessons:
255287
256- - Pending final remote validation.
288+ - Dependabot workflow branches can be blocked by token scope when they modify
289+ workflow files; applying the exact updates on ` main ` is a valid maintenance
290+ path when the final workflow and code-scanning gates pass.
291+ - Dirty lockfile PRs should not be merged blindly; applying the target lock
292+ update locally and validating the resolved lockfile keeps the final evidence
293+ attributable to the resulting ` main ` state.
257294
258295Follow-up mapping:
259296
260- - Pending final remote validation.
297+ - No follow-up SOW is needed; all three PRs are closed, ` main ` is green, and
298+ GitHub Code Scanning has 0 open alerts.
261299
262300## Outcome
263301
264- Pending.
302+ Completed. The three open Dependabot PRs were made obsolete by commit
303+ ` 6e27ee6 ` , remote validation passed on ` main ` , GitHub Code Scanning has zero
304+ open alerts, and no open PRs remain.
265305
266306## Lessons Extracted
267307
268- Pending.
308+ - Workflow-file update PRs may require a token with ` workflow ` scope for branch
309+ refresh operations.
310+ - For scanner hygiene work, final evidence should be collected from both local
311+ tools and GitHub after push because local SARIF generation alone does not
312+ prove the repository-visible code-scanning state.
269313
270314## Followup
271315
272- None yet .
316+ None.
273317
274318## Regression Log
275319
0 commit comments