Database Upgrade and Rollback SOP

Overview

This document defines a standard procedure for developing an upgrade and rollback plan for a given in-place database upgrade. This is intended for performing production database upgrades to reduce downtime and provide a method to revert the database to the pre-upgrade state in the event that the upgrade fails.

Resources

Procedure

  • Determine the version of the database that will be upgraded in place (pre-upgrade version) and the version of the database it will upgraded to (post-upgrade version)
  • Database Upgrade/Rollback Development

    • Deploy the pre-upgrade version of the database
      • Develop an automated SQL*Plus deployment script that logs and executes the database upgrade files necessary to deploy the pre-upgrade version of the database to a blank schema and loads any required data and grants any required permissions (for dependent schemas). Create a version for each of the database instances you will be deploying the database to
    • Upgrade the pre-upgrade version of the database to the post-upgrade version
      • Develop an automated SQL*Plus upgrade script that logs and executes the database upgrade files necessary to upgrade the database from the pre-upgrade version to the post-upgrade version and loads any required data and grants any required permissions (for dependent schemas). Create a version for each of the database instances you will be deploying the database to
    • Rollback the post-upgrade version of the database to the pre-upgrade version
      • Develop a SQL script that contains the DDL/DML statements necessary to revert the objects in the database from the post-upgrade to the pre-upgrade state. This can be done by examining the DDL/DML changes made during the database upgrade process.
      • Develop an automated SQL*Plus rollback script that logs and executes the database upgrade files necessary to revert the post-upgrade version of the database to the pre-upgrade version and loads any required data and grants any required permissions (for dependent schemas). Create a version for each of the database instances you will be deploying the database to
  • Testing Database Upgrade/Rollback Process

    • Use case information:
      • An existing production version of the database is deployed (pre-upgrade version)
      • An existing test version of the database is deployed for user/security testing (post-upgrade version)
    • Testing the development scripts

      • Drop all objects in the development schema
      • Execute the automated development version of the SQL*Plus deployment script on a blank development schema
        • Compare the development and production database schemas using the Oracle SQL Developer Database Diff tool to confirm they are identical
      • Execute the automated development version of the SQL*Plus upgrade script on the development schema to upgrade it to the post-upgrade version of the database
        • Compare the development and test database schemas using the Oracle SQL Developer Database Diff tool to confirm they are identical
      • Execute the automated development version of the SQL*Plus rollback script on the development database schema
        • Compare the development and production database schemas using the Oracle SQL Developer Database Diff tool to confirm they are identical
    • Testing the test scripts

      • Drop all objects in the development schema and deploy the post-upgrade version of the database to the development schema using the standard development database deployment script (example: deploy_dev_v1.1.sql).
      • Perform the same process as the development scripts with the test version of the scripts on the test schema and compare it to the development schema for the post-upgrade version.
  • Production Database Upgrade/Rollback Process

    • Automated rollback procedure

      • Note: this is the most desirable option because it uses an automated approach that does not risk data loss due to issues with the data export/import processes
      • Perform a complete backup of the data in the given database instance and save the exported data (e.g. sql insert statements in .sql format)
      • Execute the production version of the SQL*Plus upgrade script
      • Perform the corresponding application upgrades (when applicable)
        • verify the application(s) are working properly
      • Verify the database was upgraded successfully (no errors and all dependent schemas are working properly)
        • If so, the database upgrade was successful
        • If not, rollback the database upgrade
          • Execute the production version of the SQL*Plus rollback script
          • Rollback corresponding application upgrades (when applicable)
            • verify the application(s) are working properly
          • Verify the database was rolled back successfully (no errors and all dependent schemas are working properly)
            • If so, the database rollback was successful and the upgrade must be redeveloped before it is attempted again based on the issues
            • If not, the database must be restored from the backup taken before the database upgrade was attempted
    • Database Backup Rollback

      • Note: this option should be used in the event that Automated rollback procedure does not work and the given database schema is in a corrupted, intermediate state. This is not the preferred method for restoring a production database but it can be used as a last resort when both the database upgrade and rollback failed.
      • Drop all database objects
      • Restore the database objects for the desired version from source code
        • Execute the automated production version of the SQL*Plus deployment script on the blank schema
      • Import the exported data back into the restored database schema
      • Verify the database was restored successfully (no errors and all dependent schemas are working properly)