## Configuring Gantt Views

```typescript
{
type: 'gantt',
data: { provider: 'object', object: 'project_task' },
columns: ['name', 'assigned_to', 'status'], // left-pane tree columns
startField: 'start_date', // task bar start
endField: 'end_date', // task bar end
progressField: 'progress', // 0–100 fill
dependencyField: 'depends_on', // FS dependency arrows
parentField: 'parent', // builds the summary-bar tree
}
```

Rows with children (or `type: 'summary'`) render as **summary bars** — they
move the whole group on drag and have **no resize handles**. Leaf tasks resize
freely unless `locked: true`.

### Shift segmentation — `timeSegments` (排班分段, ObjectUI extension)

`timeSegments` splits each day column into ordered **bands** (e.g. 白班 / 夜班)
for shift-based scheduling. It is an **ObjectUI display extension**, *not* part
of the upstream `GanttConfigSchema` in `@objectstack/spec` — it lives only in
the gantt view config and is read by the ObjectUI gantt runtime.

```typescript
{
type: 'gantt',
data: { provider: 'object', object: 'work_order' },
startField: 'start', endField: 'end',
timeSegments: {
dayStart: '08:00', // clock time the 排班日 begins (default '00:00')
bands: [
{ key: 'day', label: '白班', start: '08:00', end: '20:00' },
{ key: 'night', label: '夜班', start: '20:00', end: '08:00', color: '#6366f1' },
],
},
}
```

Field shapes:

| Field | Required | Notes |
| --- | --- | --- |
| `dayStart` | no | `'HH:mm'` (24h). The "day" column starts here and runs a full 24h, so a cross-midnight band sits wholly inside one column. Default `'00:00'`. |
| `bands[].key` | no | Stable id (`'day'`/`'night'`); defaults to `band{index}`. |
| `bands[].label` | yes | Header text for the band (白班 / 夜班). |
| `bands[].start` / `bands[].end` | yes | `'HH:mm'`. When `end <= start` the band crosses midnight. Bands must tile the 24h day from `dayStart`. |
| `bands[].color` | no | Any CSS color. Tints that band's column; **omit for no tint**. |
| `showMidnight` | no | Draw the dashed calendar-midnight cue inside cross-midnight bands. Default `true`; set `false` to hide it. |

Behavior:

- **Day scale only.** `timeSegments` applies when the gantt is in `day` mode; in
week/month/quarter scales it is ignored (no-op).
- **Two-tier header.** Top tier = the 排班日 date (starting at `dayStart`),
bottom tier = one cell per band (each half-width for two equal bands).
- **Attribution by `start`.** A task is placed in the 排班日 its `start` falls
in, so a 夜班 spanning 20:00→次日08:00 stays in a single column.
- **Drag-snaps to band boundaries** (the band duration, e.g. 12h) instead of
whole days.
- **Calendar-midnight cue.** A subtle dashed vertical line marks local 0:00
*inside* a cross-midnight band — the 排班日 cell itself stays unbroken. Set
`showMidnight: false` to turn it off.
- **Default off = zero regression.** Omit `timeSegments` and the gantt behaves
exactly as before. Tints render only for bands that declare `color`.

---