Skip to content

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.1… #899

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.1…

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.1… #899

Triggered via push March 21, 2025 15:17
Status Failure
Total duration 43m 44s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.12)
Process completed with exit code 1.
build (3.11)
The job was canceled because "_3_12" failed.
build (3.11)
The operation was canceled.
build (3.13)
The job was canceled because "_3_12" failed.
build (3.13)
The operation was canceled.
build (3.10)
The job was canceled because "_3_12" failed.
build (3.10)
The operation was canceled.
build (3.9)
The job was canceled because "_3_12" failed.
build (3.9)
The operation was canceled.