Skip to content

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.4 #919

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.4

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.4 #919

Triggered via pull request April 4, 2025 19:03
Status Failure
Total duration 1m 26s
Artifacts

build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.11)
Process completed with exit code 1.
build (3.12)
The job was canceled because "_3_11" failed.
build (3.12)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_11" failed.
build (3.9)
Process completed with exit code 1.
build (3.13)
The job was canceled because "_3_11" failed.
build (3.13)
Process completed with exit code 1.