chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.4 #919
build.yml
on: pull_request
lint
23s
sast
1m 14s
Matrix: build
Annotations
9 errors
|
build (3.11)
Process completed with exit code 1.
|
|
build (3.12)
The job was canceled because "_3_11" failed.
|
|
build (3.12)
Process completed with exit code 1.
|
|
build (3.10)
The job was canceled because "_3_11" failed.
|
|
build (3.10)
Process completed with exit code 1.
|
|
build (3.9)
The job was canceled because "_3_11" failed.
|
|
build (3.9)
Process completed with exit code 1.
|
|
build (3.13)
The job was canceled because "_3_11" failed.
|
|
build (3.13)
Process completed with exit code 1.
|