Skip to content

Commit c702790

Browse files
authored
Update 03a_flowchart_step_by_step.md
1 parent bedd48d commit c702790

1 file changed

Lines changed: 2 additions & 21 deletions

File tree

docs/03_Investigator/02_FRAME/03a_flowchart_step_by_step.md

Lines changed: 2 additions & 21 deletions
Original file line numberDiff line numberDiff line change
@@ -8,26 +8,7 @@
88

99
![WhatsApp Bild 2025-08-13 um 13 51 45_f8a0129c](https://github.com/user-attachments/assets/a2f9cb36-36bd-4e50-b357-d839ee9302e2)
1010

11+
## MIRO Draft ##
12+
https://miro.com/app/board/uXjVLR91oLU=/
1113

1214

13-
Before beginning installation, ensure you have:
14-
15-
- [ ] Read all safety information in [Safety and Compliance](./01_Safety_and_Compliance.md)
16-
- [ ] Verified environmental conditions meet specifications in [Technical Specifications](./03_Technical_Specifications.md)
17-
- [ ] Prepared adequate workspace (minimum 1 m × 1.5 m)
18-
- [ ] Organized necessary tools (see Tool Requirements below)
19-
- [ ] Verified power supply compatibility in [Technical Specifications](./03_Technical_Specifications.md)
20-
21-
### Package Inspection
22-
23-
1. **Upon Delivery**:
24-
- Inspect packaging for damage during shipment
25-
- Document any visible damage with photographs
26-
- Check that all packages are received according to packing list
27-
28-
2. **Unpacking Procedure**:
29-
- Use proper lifting techniques (system weight: 25-35 kg)
30-
- Remove packaging materials carefully to avoid damage
31-
- Keep packaging materials until installation is complete
32-
- Verify all components against the packing list
33-

0 commit comments

Comments
 (0)