-
Notifications
You must be signed in to change notification settings - Fork 272
Pull requests: openshift-eng/ocp-build-data
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
[5.0] images: add rpm-lockfile-prototype backend for hyperkube and must-gather
#11763
opened Jul 9, 2026 by
ashwindasr
Contributor
Loading…
ART-21534 - Bump 4.23 golang builders to 1.26.4
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#11761
opened Jul 9, 2026 by
openshift-bot
Loading…
ART-21534 - Bump 5.0 golang builders to 1.26.4
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#11758
opened Jul 9, 2026 by
openshift-bot
Loading…
Content migrated to golang monobranch: RHEL 9 golang 1.26
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11756
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 9 golang 1.25
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11755
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 9 golang 1.24
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11754
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 9 golang 1.23
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11753
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 9 golang 1.22
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11752
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 9 golang 1.21
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11751
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 9 golang 1.20
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11750
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 9 golang 1.19
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11749
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 8 golang 1.26
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11748
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 8 golang 1.25
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11747
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 8 golang 1.24
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11746
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 8 golang 1.23
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11745
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 8 golang 1.22
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11744
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 8 golang 1.21
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11743
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 8 golang 1.20
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11742
opened Jul 9, 2026 by
kopero2000
•
Draft
Content migrated to golang monobranch: RHEL 8 golang 1.19
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#11741
opened Jul 9, 2026 by
kopero2000
•
Draft
ART-21453: Add image config for ose-haproxy-router-haproxy32
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
tide/merge-method-squash
Denotes a PR that should be squashed by tide when it merges.
#11725
opened Jul 8, 2026 by
ashwindasr
Contributor
Loading…
Introduce base-rhel9 image and replace ubi-minimal references [mce-2.11]
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#11697
opened Jul 7, 2026 by
girish1430
Loading…
delete(images): remove obsolete ovirt CSI operator and driver config files
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#11674
opened Jul 5, 2026 by
kasemAlem
Loading…
delete(images): remove obsolete ovirt CSI operator and driver config files
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#11673
opened Jul 5, 2026 by
kasemAlem
Loading…
delete(images): remove obsolete ovirt CSI operator and driver config files
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#11672
opened Jul 5, 2026 by
kasemAlem
Loading…
delete(images): remove obsolete ovirt CSI operator and driver config files
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#11671
opened Jul 5, 2026 by
kasemAlem
Loading…
Previous Next
ProTip!
Type g i on any issue or pull request to go back to the issue listing page.