feat: primary resource caching for followup reconciliation(s) #5140
pr.yml
on: pull_request
check_format_and_unit_tests
1m 8s
Matrix: build / httpclient-tests
Matrix: build / integration_tests
Matrix: build / special_integration_tests
Annotations
4 errors
|
build / integration_tests (21, 1.31.4) / Integration tests (21, 1.31.4, vertx)
Process completed with exit code 1.
|
|
build / integration_tests (17, 1.31.4) / Integration tests (17, 1.31.4, vertx)
The operation was canceled.
|
|
build / integration_tests (17, 1.31.4) / Integration tests (17, 1.31.4, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_4" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_4" failed
|