feat: cache update on update control #5179
pr.yml
on: pull_request
check_format_and_unit_tests
48s
Matrix: build / httpclient-tests
Matrix: build / integration_tests
Matrix: build / special_integration_tests
Annotations
8 errors
|
check_format_and_unit_tests
Process completed with exit code 1.
|
|
build / integration_tests (24, 1.31.8) / Integration tests (24, 1.31.8, vertx)
Process completed with exit code 1.
|
|
build / integration_tests (21, 1.31.8) / Integration tests (21, 1.31.8, vertx)
The operation was canceled.
|
|
build / integration_tests (21, 1.31.8) / Integration tests (21, 1.31.8, vertx)
The strategy configuration was canceled because "build.integration_tests._24_1_31_8" failed
|
|
build / integration_tests (24, 1.33.0) / Integration tests (24, 1.33.0, vertx)
The operation was canceled.
|
|
build / integration_tests (24, 1.33.0) / Integration tests (24, 1.33.0, vertx)
The strategy configuration was canceled because "build.integration_tests._24_1_31_8" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._24_1_31_8" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._24_1_31_8" failed
|