Skip to content

chore(deps): bump org.junit:junit-bom from 5.13.0 to 5.13.1 #5243

chore(deps): bump org.junit:junit-bom from 5.13.0 to 5.13.1

chore(deps): bump org.junit:junit-bom from 5.13.0 to 5.13.1 #5243

Triggered via pull request June 9, 2025 03:50
Status Failure
Total duration 30m 6s
Artifacts

pr.yml

on: pull_request
check_format_and_unit_tests
1m 36s
check_format_and_unit_tests
Matrix: build / httpclient-tests
Matrix: build / integration_tests
Matrix: build / special_integration_tests
Fit to window
Zoom out
Zoom in

Annotations

34 errors
build / integration_tests (21, 1.31.8) / Integration tests (21, 1.31.8, vertx)
Process completed with exit code 1.
build / integration_tests (21, 1.30.12) / Integration tests (21, 1.30.12, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (17, 1.30.12) / Integration tests (17, 1.30.12, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (17, 1.31.8) / Integration tests (17, 1.31.8, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (17, 1.33.0) / Integration tests (17, 1.33.0, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (21, 1.32.4) / Integration tests (21, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (21, 1.33.0) / Integration tests (21, 1.33.0, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (17, 1.32.4) / Integration tests (17, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (24, 1.32.4) / Integration tests (24, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (24, 1.30.12) / Integration tests (24, 1.30.12, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (24, 1.31.8) / Integration tests (24, 1.31.8, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / integration_tests (24, 1.33.0) / Integration tests (24, 1.33.0, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
build / httpclient-tests (jdk) / Integration tests (24, 1.32.0, jdk)
Process completed with exit code 1.
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_31_8" failed