Obsolete resource handling for read-cache-after-write #6344
Triggered via pull request
March 9, 2026 17:11
Status
Cancelled
Total duration
1h 54m 57s
Artifacts
–
pr.yml
on: pull_request
check_format_and_unit_tests
1m 36s
Matrix: build / httpclient-tests
Matrix: build / integration_tests
Matrix: build / special_integration_tests
Annotations
49 errors
|
build / integration_tests (21, 1.33.1) / Integration tests (21, 1.33.1, vertx)
Request failed with status code 502
|
|
build / integration_tests (21, 1.33.1) / Integration tests (21, 1.33.1, vertx)
Request failed with status code 502
|
|
build / integration_tests (17, 1.30.12) / Integration tests (17, 1.30.12, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (17, 1.30.12) / Integration tests (17, 1.30.12, vertx)
The operation was canceled.
|
|
build / integration_tests (21, 1.30.12) / Integration tests (21, 1.30.12, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (21, 1.30.12) / Integration tests (21, 1.30.12, vertx)
The operation was canceled.
|
|
build / integration_tests (17, 1.33.1) / Integration tests (17, 1.33.1, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (17, 1.33.1) / Integration tests (17, 1.33.1, vertx)
The operation was canceled.
|
|
build / integration_tests (17, 1.31.8) / Integration tests (17, 1.31.8, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (17, 1.31.8) / Integration tests (17, 1.31.8, vertx)
The operation was canceled.
|
|
build / integration_tests (25, 1.31.8) / Integration tests (25, 1.31.8, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (25, 1.31.8) / Integration tests (25, 1.31.8, vertx)
The operation was canceled.
|
|
build / integration_tests (25, 1.30.12) / Integration tests (25, 1.30.12, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (25, 1.30.12) / Integration tests (25, 1.30.12, vertx)
The operation was canceled.
|
|
build / integration_tests (21, 1.32.4) / Integration tests (21, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (21, 1.32.4) / Integration tests (21, 1.32.4, vertx)
The operation was canceled.
|
|
build / integration_tests (17, 1.32.4) / Integration tests (17, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (17, 1.32.4) / Integration tests (17, 1.32.4, vertx)
The operation was canceled.
|
|
build / integration_tests (25, 1.32.4) / Integration tests (25, 1.32.4, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (25, 1.32.4) / Integration tests (25, 1.32.4, vertx)
The operation was canceled.
|
|
build / integration_tests (25, 1.33.1) / Integration tests (25, 1.33.1, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (25, 1.33.1) / Integration tests (25, 1.33.1, vertx)
The operation was canceled.
|
|
build / integration_tests (21, 1.31.8) / Integration tests (21, 1.31.8, vertx)
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
build / integration_tests (21, 1.31.8) / Integration tests (21, 1.31.8, vertx)
The operation was canceled.
|
|
build / httpclient-tests (jetty) / Integration tests (25, 1.32.0, jetty)
The job has exceeded the maximum execution time of 40m0s
|
|
build / httpclient-tests (jetty) / Integration tests (25, 1.32.0, jetty)
The operation was canceled.
|
|
build / httpclient-tests (jdk) / Integration tests (25, 1.32.0, jdk)
The job has exceeded the maximum execution time of 40m0s
|
|
build / httpclient-tests (jdk) / Integration tests (25, 1.32.0, jdk)
The operation was canceled.
|
|
build / httpclient-tests (vertx) / Integration tests (25, 1.32.0, vertx)
The job has exceeded the maximum execution time of 40m0s
|
|
build / httpclient-tests (vertx) / Integration tests (25, 1.32.0, vertx)
The operation was canceled.
|
|
build / Special integration tests (21)
Canceling since a higher priority waiting request for refs/pull/3207/merge-Verify Pull Request exists
|
|
build / Special integration tests (21)
The operation was canceled.
|
|
build / Special integration tests (25)
Canceling since a higher priority waiting request for refs/pull/3207/merge-Verify Pull Request exists
|
|
build / Special integration tests (25)
The operation was canceled.
|
|
build / Special integration tests (17)
Canceling since a higher priority waiting request for refs/pull/3207/merge-Verify Pull Request exists
|
|
build / Special integration tests (17)
The operation was canceled.
|
|
Verify Pull Request
Canceling since a higher priority waiting request for refs/pull/3207/merge-Verify Pull Request exists
|
|
Verify Pull Request
Canceling since a higher priority waiting request for refs/pull/3207/merge-Verify Pull Request exists
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|
|
Verify Pull Request
The strategy configuration was canceled because "build.integration_tests._21_1_33_1" failed
|