feat: Allow option publicServerURL to be set dynamically as asynchronous function
#8478
ci.yml
on: pull_request
Node Engine Check
32s
Lint
34s
Check Definitions
29s
Circular Dependencies
29s
Docker Build
5m 26s
NPM Lock File Version
10s
Check Types
29s
Matrix: Code Analysis
Matrix: check-mongo
Matrix: check-postgres
Annotations
19 errors
|
Code Analysis (javascript)
CodeQL Action major versions v1 and v2 have been deprecated. Please update all occurrences of the CodeQL Action in your workflow files to v3. For more information, see https://github.blog/changelog/2025-01-10-code-scanning-codeql-action-v2-is-now-deprecated/
|
|
Redis Cache
Process completed with exit code 3.
|
|
Node 20
Process completed with exit code 3.
|
|
Node 22
Process completed with exit code 3.
|
|
Node 18
Process completed with exit code 3.
|
|
MongoDB 8, ReplicaSet
Process completed with exit code 3.
|
|
MongoDB 7, ReplicaSet
Process completed with exit code 3.
|
|
MongoDB 6, ReplicaSet
Process completed with exit code 3.
|
|
PostgreSQL 17, PostGIS 3.5
Process completed with exit code 3.
|
|
PostgreSQL 16, PostGIS 3.5
The job has exceeded the maximum execution time of 20m0s
|
|
PostgreSQL 16, PostGIS 3.5
The operation was canceled.
|
|
PostgreSQL 15, PostGIS 3.3
The job has exceeded the maximum execution time of 20m0s
|
|
PostgreSQL 15, PostGIS 3.3
The operation was canceled.
|
|
PostgreSQL 15, PostGIS 3.5
The job has exceeded the maximum execution time of 20m0s
|
|
PostgreSQL 15, PostGIS 3.5
The operation was canceled.
|
|
PostgreSQL 18, PostGIS 3.6
The job has exceeded the maximum execution time of 20m0s
|
|
PostgreSQL 18, PostGIS 3.6
The operation was canceled.
|
|
PostgreSQL 15, PostGIS 3.4
The job has exceeded the maximum execution time of 20m0s
|
|
PostgreSQL 15, PostGIS 3.4
The operation was canceled.
|