chore: image build improvements #81
continuous-integration.yml
on: pull_request
Matrix: build-push-test / build-push
Matrix: build-push-test / acceptance-test
Waiting for pending jobs
Matrix: build-push-test / integration-test
Waiting for pending jobs
build-push-test
/
dependency-review
build-push-test
/
publish-test-results
20s
Annotations
8 errors and 1 warning
|
build-push-test / build-push (rust) / build-push (ubuntu-latest)
buildx failed with: ERROR: failed to solve: process "/bin/bash -o pipefail -c rustup set profile minimal && rustup default ${RUST_VERSION} && rustup component add clippy llvm-tools rustfmt && rustup target add thumbv7em-none-eabi && rustup target add thumbv7em-none-eabihf" did not complete successfully: exit code: 127
|
|
build-push-test / build-push (rust) / build-push (ubuntu-24.04-arm)
The operation was canceled.
|
|
build-push-test / build-push (rust) / build-push (ubuntu-24.04-arm)
The strategy configuration was canceled because "build-push-test.build-push.rust.build-push.ubuntu-latest" failed
|
|
build-push-test / build-push (cpp) / build-push (ubuntu-24.04-arm)
The operation was canceled.
|
|
build-push-test / build-push (cpp) / build-push (ubuntu-24.04-arm)
The strategy configuration was canceled because "build-push-test.build-push.rust" failed
|
|
build-push-test / build-push (cpp) / build-push (ubuntu-latest)
The operation was canceled.
|
|
build-push-test / build-push (cpp) / build-push (ubuntu-latest)
The strategy configuration was canceled because "build-push-test.build-push.rust" failed
|
|
Continuous Integration
The strategy configuration was canceled because "build-push-test.build-push.rust" failed
|
|
build-push-test / publish-test-results
Could not find any files for test-report-*.xml
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
philips-software~amp-devcontainer~CX7ZK0.dockerbuild
Expired
|
44.6 KB |
sha256:37cfe6f58b0d5a3fe062d9c1b48c62e54531b59677350c7d568cb86d5c9b1f3f
|
|