Skip to content

Auto FBC release tekton-fbc-operator-2026-418 0.0.92#7067

Open
rh-operator-bundle-bot wants to merge 1 commit into
stagefrom
add-tekton-fbc-operator-2026-418-0.0.92-to-fbc-27487
Open

Auto FBC release tekton-fbc-operator-2026-418 0.0.92#7067
rh-operator-bundle-bot wants to merge 1 commit into
stagefrom
add-tekton-fbc-operator-2026-418-0.0.92-to-fbc-27487

Conversation

@rh-operator-bundle-bot

Copy link
Copy Markdown
Collaborator

🚀 Automated PR: FBC Release Process

This pull request was automatically generated as part of the FBC release process.

  • Operator: tekton-fbc-operator-2026-418
  • Version: 0.0.92
  • Image: registry.connect.stage.redhat.com/tekton-pipeline-automation/tekton-fbc-operator-2026-418@sha256:00cb7e9a6c27ebccd42db80923a1b35bca30757bb14fc99018c0114f56df381e

For reference, see the previous PR.

If you have any questions or need modifications, please let us know!

Signed-off-by: rh-operator-bundle-bot <exd-guild-isv+operators@redhat.com>
@rh-operator-bundle-bot

Copy link
Copy Markdown
Collaborator Author

Pipeline Summary

Pipeline: operator-hosted-pipeline
PipelineRun: operator-hosted-pipeline-run9cxjd
Start Time: 2026-04-16 14:04:40+00:00

Tasks

Status Task Start Time Duration
get-pr-number 2026-04-16 14:04:44+00:00 2 seconds

Pipeline logs: https://gist.github.com/rh-operator-bundle-bot/252d99c47ae44cdf7f05fe26e6c01d0e

Troubleshooting

Please refer to the troubleshooting guide.

Run /pipeline restart operator-hosted-pipeline in case of pipeline failure to restart a pipeline.

@openshift-ci

openshift-ci Bot commented Apr 18, 2026

Copy link
Copy Markdown

PR needs rebase.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

@openshift-ci openshift-ci Bot added the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Apr 18, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. operator-hosted-pipeline/failed

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant