Skip to content

chore: allow creation of replane client without connection options #103

chore: allow creation of replane client without connection options

chore: allow creation of replane client without connection options #103

Triggered via push January 5, 2026 19:08
Status Cancelled
Total duration 1m 33s
Artifacts 1

main.yml

on: push
Matrix: checks
Release
Release
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Python 3.10 - Type check
Process completed with exit code 1.
Python 3.12 - Test
Canceling since a higher priority waiting request for Main-refs/heads/main exists
Python 3.12 - Test
The operation was canceled.
Python 3.13 - Test
Canceling since a higher priority waiting request for Main-refs/heads/main exists
Python 3.13 - Test
The operation was canceled.
Python 3.14 - Test
Canceling since a higher priority waiting request for Main-refs/heads/main exists
Python 3.14 - Test
The operation was canceled.
Python 3.11 - Test
Canceling since a higher priority waiting request for Main-refs/heads/main exists
Python 3.11 - Test
The operation was canceled.
Python 3.10 - Test
Canceling since a higher priority waiting request for Main-refs/heads/main exists
Python 3.10 - Test
The operation was canceled.
Main
Canceling since a higher priority waiting request for Main-refs/heads/main exists

Artifacts

Produced during runtime
Name Size Digest
package Expired
110 KB
sha256:e7e045cba6fc06b80d9a372eeb0af362412304136e4a8e6c853b143c9128e3fd