Skip to content

build(deps): update prettytable requirement from >=3.9.0 to >=3.16.0 #38

build(deps): update prettytable requirement from >=3.9.0 to >=3.16.0

build(deps): update prettytable requirement from >=3.9.0 to >=3.16.0 #38

Triggered via pull request June 18, 2026 07:50
Status Failure
Total duration 2m 0s
Artifacts

ci.yml

on: pull_request
Matrix: test
validation
2s
validation
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (3.10)
Process completed with exit code 2.
test (3.11)
The strategy configuration was canceled because "test._3_10" failed
test (3.11)
Process completed with exit code 2.
test (3.12)
The strategy configuration was canceled because "test._3_10" failed
test (3.12)
The operation was canceled.
validation
Process completed with exit code 1.