Skip to content

update CI configuration to include Ruby 2.7 in the testing matrix #115

update CI configuration to include Ruby 2.7 in the testing matrix

update CI configuration to include Ruby 2.7 in the testing matrix #115

Triggered via pull request August 11, 2025 03:49
Status Failure
Total duration 37s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (head)
Process completed with exit code 1.
test (2.7)
The operation was canceled.
test (2.7)
The strategy configuration was canceled because "test.head" failed
test (3.1.0)
The operation was canceled.
test (3.1.0)
The strategy configuration was canceled because "test.head" failed