update CI configuration to include Ruby 2.7 in the testing matrix #117
Annotations
5 errors
|
test (3.1.0)
Process completed with exit code 1.
|
|
test (2.7)
The operation was canceled.
|
|
test (2.7)
The strategy configuration was canceled because "test._3_1_0" failed
|
|
test (head)
The operation was canceled.
|
|
test (head)
The strategy configuration was canceled because "test._3_1_0" failed
|