Skip to content

refactor: restructure entire repo from v0-v9 to s01-s11 learning sess… #33

refactor: restructure entire repo from v0-v9 to s01-s11 learning sess…

refactor: restructure entire repo from v0-v9 to s01-s11 learning sess… #33

Triggered via push February 18, 2026 13:46
Status Failure
Total duration 41s
Artifacts

test.yml

on: push
Matrix: session-test
Fit to window
Zoom out
Zoom in

Annotations

24 errors
session-test (v8a)
Process completed with exit code 2.
session-test (v3)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v3)
Process completed with exit code 2.
session-test (v4)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v4)
Process completed with exit code 2.
session-test (v0)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v0)
Process completed with exit code 2.
session-test (v7)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v7)
The operation was canceled.
unit-test
Process completed with exit code 2.
session-test (v6)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v6)
The operation was canceled.
session-test (v9)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v9)
Process completed with exit code 2.
session-test (v2)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v2)
The operation was canceled.
session-test (v1)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v1)
The operation was canceled.
session-test (v8b)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v8b)
The operation was canceled.
session-test (v8c)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v8c)
The operation was canceled.
session-test (v5)
The strategy configuration was canceled because "session-test.v8a" failed
session-test (v5)
The operation was canceled.