Skip to content

better doc

better doc #77

Triggered via push February 26, 2026 17:12
Status Failure
Total duration 1m 20s
Artifacts

test.yml

on: push
Matrix: session-test
Fit to window
Zoom out
Zoom in

Annotations

23 errors
session-test (v9)
Process completed with exit code 2.
session-test (v6)
Process completed with exit code 2.
session-test (v2)
The strategy configuration was canceled because "session-test.v6" failed
session-test (v2)
Process completed with exit code 2.
unit-test
Process completed with exit code 2.
session-test (v3)
The strategy configuration was canceled because "session-test.v6" failed
session-test (v3)
Process completed with exit code 2.
session-test (v8a)
The strategy configuration was canceled because "session-test.v6" failed
session-test (v8a)
Process completed with exit code 2.
session-test (v0)
The strategy configuration was canceled because "session-test.v6" failed
session-test (v0)
Process completed with exit code 2.
session-test (v8b)
The strategy configuration was canceled because "session-test.v6" failed
session-test (v8b)
Process completed with exit code 2.
session-test (v1)
The strategy configuration was canceled because "session-test.v6" failed
session-test (v1)
The operation was canceled.
session-test (v5)
The strategy configuration was canceled because "session-test.v6" failed
session-test (v5)
Process completed with exit code 2.
session-test (v7)
The strategy configuration was canceled because "session-test.v6" failed
session-test (v7)
The operation was canceled.
session-test (v4)
The strategy configuration was canceled because "session-test.v6" failed
session-test (v4)
The operation was canceled.
session-test (v8c)
The strategy configuration was canceled because "session-test.v6" failed
session-test (v8c)
The operation was canceled.