| Maximum Total Electricity Generation | {{ max_total_generation_mwe }} MW | Upper bound: 600 MW | Combined nameplate capacity of 10×60 MWe Gen 2 ORCs. A total of 8×60 MWe Gen 2 ORCs have been announced for Phase II; 3 from Turboden and 5 from Baker Hughes (Turboden, 2025; Jacobs, 2025). This equates to 480 MW gross capacity for Phase II's 400 MW net capacity. An equivalent SOAK 500 MW project would therefore require 10 Gen 2 ORC units. (Note that the modular Gen 2 ORCs are not individually modeled in this case study, and are assumed to be combined into a single power plant.) |