conversion efficiency result reference value note
1 parent 8ed0d46 commit 05c827a

1 file changed

Lines changed: 1 addition & 1 deletion

File tree

docs/Fervo_Project_Cape-5.md.jinja

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -321,7 +321,7 @@ See [GEOPHIRES Economic Outputs documentation](parameters.html#economic-paramete
321321
| Maximum Net Electricity Generation | {{ max_net_generation_mwe}} MW | | |
322322
| Maximum Total Electricity Generation | {{ max_total_generation_mwe }} MW | Upper bound: 600 MW | Combined nameplate capacity of 10×60 MWe Gen 2 ORCs. A total of 8×60 MWe Gen 2 ORCs have been announced for Phase II; 3 from Turboden and 5 from Baker Hughes (Turboden, 2025; Jacobs, 2025). This equates to 480 MW gross capacity for Phase II's 400 MW net capacity. An equivalent SOAK 500 MW project would therefore require 10 Gen 2 ORC units. (Note that the modular Gen 2 ORCs are not individually modeled in this case study, and are assumed to be combined into a single power plant.) |
323323
| 2-year Average Net Power Production per Production Well | {{ two_year_avg_net_power_mwe_per_production_well }} MW | 7.6–11.5 MW | Figures 4 and 12 (Singh et al., 2025). |
324-
| Heat to Power Conversion Efficiency | {{ heat_to_power_conversion_efficiency_pct ~ '%' }} | 19.5% | DeGolyer and MacNaughton, 2024. |
324+
| Heat to Power Conversion Efficiency | {{ heat_to_power_conversion_efficiency_pct ~ '%' }} | 19.5% (Likely omits internal plant parasitic loads, such as condenser fans, which GEOPHIRES explicitly accounts for.) | DeGolyer and MacNaughton, 2024. |
325325
| Injection Pumping Parasitic Load <br/> ({Average Pumping Power}/{Average Total Electricity Generation}) | {{ parasitic_loss_pct ~ '%' }} | Upper bound: 16.7% | The Phase II procurement strategy (480 MW gross / 400 MW net) implies a design ceiling of 16.7% for total on-site consumption (including injection pumping). Current SOAK targets for parasitic consumption range from 15–20%, reflecting a planned reduction from the ~25–30% observed in Phase I operations (Norbeck, 2026). |
326326
| Total fracture surface area per well | {{ total_fracture_surface_area_per_well_mm2 }}×10⁶ m² <br/> ({{ total_fracture_surface_area_per_well_mft2 }} million ft²) | Project Red: 2.787×10⁶ m² <br/> (30 million ft²) | Greater fracture surface area expected than Project Red (Fercho et al., 2025). |
327327
| Reservoir Volume | {{ reservoir_volume_m3 }} m³ | | Calculated from fracture area × fracture separation × number of fractures per well × number of wells |