Skip to content

Commit 5877ff7

Browse files
use 10 time steps per year for consistency with other examples and alignment with 12 months per year
1 parent efddab4 commit 5877ff7

2 files changed

Lines changed: 15 additions & 15 deletions

File tree

tests/examples/Fervo_Project_Red-2026.out

Lines changed: 14 additions & 14 deletions
Original file line numberDiff line numberDiff line change
@@ -6,14 +6,14 @@ Simulation Metadata
66
----------------------
77
GEOPHIRES Version: 3.13.1
88
Simulation Date: 2026-04-19
9-
Simulation Time: 08:44
10-
Calculation Time: 0.135 sec
9+
Simulation Time: 08:55
10+
Calculation Time: 0.155 sec
1111

1212
***SUMMARY OF RESULTS***
1313

1414
End-Use Option: Electricity
1515
Average Net Electricity Production: 1.88 MW
16-
Electricity breakeven price: 111.31 cents/kWh
16+
Electricity breakeven price: 111.33 cents/kWh
1717
Number of production wells: 1
1818
Number of injection wells: 1
1919
Flowrate per production well: 36.0 kg/sec
@@ -85,8 +85,8 @@ Simulation Metadata
8585

8686
Maximum Production Temperature: 175.2 degC
8787
Average Production Temperature: 174.7 degC
88-
Minimum Production Temperature: 173.6 degC
89-
Initial Production Temperature: 173.6 degC
88+
Minimum Production Temperature: 173.5 degC
89+
Initial Production Temperature: 173.5 degC
9090
Average Reservoir Heat Extraction: 18.10 MW
9191
Production Wellbore Heat Transmission Model = Ramey Model
9292
Average Production Well Temperature Drop: 4.7 degC
@@ -126,20 +126,20 @@ Simulation Metadata
126126
Average Net Electricity Generation: 1.88 MW
127127
Minimum Net Electricity Generation: 1.83 MW
128128
Initial Net Electricity Generation: 1.83 MW
129-
Average Annual Total Electricity Generation: 20.27 GWh
130-
Average Annual Net Electricity Generation: 14.82 GWh
131-
Initial pumping power/net installed power: 37.71 %
129+
Average Annual Total Electricity Generation: 20.26 GWh
130+
Average Annual Net Electricity Generation: 14.81 GWh
131+
Initial pumping power/net installed power: 37.83 %
132132
Average Pumping Power: 0.69 MW
133-
Heat to Power Conversion Efficiency: 10.38 %
133+
Heat to Power Conversion Efficiency: 10.37 %
134134

135135
************************************************************
136136
* HEATING, COOLING AND/OR ELECTRICITY PRODUCTION PROFILE *
137137
************************************************************
138138
YEAR THERMAL GEOFLUID PUMP NET FIRST LAW
139139
DRAWDOWN TEMPERATURE POWER POWER EFFICIENCY
140140
(degC) (MW) (MW) (%)
141-
1 1.0000 173.60 0.6912 1.8330 10.2249
142-
2 1.0077 174.95 0.6911 1.8859 10.4023
141+
1 1.0000 173.46 0.6912 1.8272 10.2049
142+
2 1.0086 174.94 0.6911 1.8857 10.4015
143143

144144

145145
*******************************************************************
@@ -148,7 +148,7 @@ Simulation Metadata
148148
YEAR ELECTRICITY HEAT RESERVOIR PERCENTAGE OF
149149
PROVIDED EXTRACTED HEAT CONTENT TOTAL HEAT MINED
150150
(GWh/year) (GWh/year) (10^15 J) (%)
151-
1 14.7 142.4 6.68 7.12
151+
1 14.7 142.3 6.68 7.12
152152
2 14.9 143.1 6.17 14.28
153153

154154

@@ -160,5 +160,5 @@ Since Price Ann. Rev. Cumm. Rev. | Price Ann. Rev. Cumm. Rev. | Pr
160160
Start (cents/kWh)(MUSD/yr) (MUSD) |(cents/kWh) (MUSD/yr) (MUSD) |(cents/kWh) (MUSD/yr) (MUSD) |(USD/lb) (MUSD/yr) (MUSD) |(MUSD/yr) (MUSD/yr) (MUSD)
161161
________________________________________________________________________________________________________________________________________________________________________________________
162162
0 0.00 0.00 0.00 | 0.00 0.00 0.00 | 0.00 0.00 0.00 | 0.00 0.00 0.00 | 0.00 -26.83 -26.83
163-
1 15.00 2.21 2.21 | 2.50 0.00 0.00 | 2.50 0.00 0.00 | 0.00 0.00 0.00 | 0.83 1.38 -25.46
164-
2 15.00 2.24 4.45 | 2.50 0.00 0.00 | 2.50 0.00 0.00 | 0.00 0.00 0.00 | 0.83 1.41 -24.05
163+
1 15.00 2.21 2.21 | 2.50 0.00 0.00 | 2.50 0.00 0.00 | 0.00 0.00 0.00 | 0.83 1.37 -25.46
164+
2 15.00 2.24 4.44 | 2.50 0.00 0.00 | 2.50 0.00 0.00 | 0.00 0.00 0.00 | 0.83 1.41 -24.05

tests/examples/Fervo_Project_Red-2026.txt

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -61,4 +61,4 @@ Investment Tax Credit Rate, 0, -- Required for BICYCLE model
6161
Inflation Rate During Construction, 0.05
6262
Property Tax Rate, 0, -- Required for BICYCLE model
6363
Print Output to Console, 1
64-
Time steps per year, 10
64+
Time steps per year, 12

0 commit comments

Comments
 (0)