@@ -46,7 +46,7 @@ the [web interface](https://gtp.scientificwebservices.com/geophires/?geophires-e
46
46
| Inflation Rate | 2.3% | US inflation rate as of April 2025 |
47
47
| PPA Price | Starting at 9.5 cents/kWh, escalating to 10 cents/kWh by project year 11 | Upper end of ranges given in https://atb.nrel.gov/electricity/2024/geothermal. Both PPAs 'firm for 10 years at less than $100/MWh' estimate given in a podcast. |
48
48
| Well Drilling Cost Correlation & Adjustment Factor | Vertical large baseline correlation + adjustment factor = 0.84 to align with Fervo claimed drilling costs of <$4M/well | Akindipe, D. and Witter. E. 2025. "2025 Geothermal Drilling Cost Curves Update". https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2025/Akindipe.pdf?t=1740084555; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal.|
49
-
| Reservoir Stimulation Capital Cost Adjustment Factor | 2 | Estimated cost of ~$1.5M per well falls within typical range of $0.5–2M|
49
+
| Reservoir Stimulation Capital Cost Adjustment Factor | 2.66| Estimated cost of ~$2M per well. Typical range for Nth-of-kind projects may be $0.5–2M.|
50
50
| Capital Cost for Power Plant for Electricity Generation | $1900/kW |https://betterbuildingssolutioncenter.energy.gov/sites/default/files/attachments/Waste_Heat_to_Power_Fact_Sheet.pdf|
51
51
| Discount Rate | 12% | Typical discount rates for high-risk projects may be 12–15% |
| LCOE | $81.6/MWh | $80/MWh | Horne, R., Genter, A., McClure, M. et al. Enhanced geothermal systems for clean firm energy generation. Nat. Rev. Clean Technol. 1, 148–160 (2025). https://doi.org/10.1038/s44359-024-00019-9|
65
-
| Project capital costs |~$4500/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne, R., Genter, A., McClure, M. et al. Enhanced geothermal systems for clean firm energy generation. Nat. Rev. Clean Technol. 1, 148–160 (2025). https://doi.org/10.1038/s44359-024-00019-9; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal.|
66
-
| Maximum Total Electricity Generation | 615 MW || Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 600 MW. |
67
-
| Minimum Net Electricity Generation | 500 MW | 500 MW |https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
68
-
| Average Production Temperature | 198.9℃ | 204℃, 190.6–198.6℃ (optimal plant operating range) |https://jpt.spe.org/fervo-and-forge-report-breakthrough-test-results-signaling-more-progress-for-enhanced-geothermal; https://eartharxiv.org/repository/view/7665/.|
69
-
| Well Drilling and Completion Cost Correlation| $3.96M/well | $<4M/well | Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal|
| LCOE | $83.5/MWh | $80/MWh | Horne, R., Genter, A., McClure, M. et al. Enhanced geothermal systems for clean firm energy generation. Nat. Rev. Clean Technol. 1, 148–160 (2025). https://doi.org/10.1038/s44359-024-00019-9|
65
+
| Project capital costs |~$4600/kW (based on maximum total electricity generation) | $4500/kW, $3000–$6000/kW | Horne, R., Genter, A., McClure, M. et al. Enhanced geothermal systems for clean firm energy generation. Nat. Rev. Clean Technol. 1, 148–160 (2025). https://doi.org/10.1038/s44359-024-00019-9; Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal.|
66
+
| Maximum Total Electricity Generation | 615 MW || Actual maximum total generation may be bounded or constrained by modular power plant design not modeled in this case study. For example, a modular design with 50MW units may constrain maximum total generation to 600 MW. |
67
+
| Minimum Net Electricity Generation | 500 MW | 500 MW |https://fervoenergy.com/fervo-energy-announces-31-mw-power-purchase-agreement-with-shell-energy/. The 500 MW PPA is interpreted to mean that Cape Station's net electricity generation must never fall below 500 MWe. |
68
+
| Average Production Temperature | 198.9℃ | 204℃, 190.6–198.6℃ (optimal plant operating range) |https://jpt.spe.org/fervo-and-forge-report-breakthrough-test-results-signaling-more-progress-for-enhanced-geothermal; https://eartharxiv.org/repository/view/7665/.|
69
+
| Well Drilling and Completion Cost | $3.96M/well | $<4M/well | Latimer, T. (2025, February 12). Catching up with enhanced geothermal (D. Roberts, Interviewer). https://www.volts.wtf/p/catching-up-with-enhanced-geothermal|