fix doc typo
1 parent 83381a8 commit a3ed2eb

1 file changed

Lines changed: 1 addition & 1 deletion

File tree

docs/SAM-Economic-Models.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -26,7 +26,7 @@ The following table describes how GEOPHIRES parameters are transformed into SAM
2626
| GEOPHIRES Parameter(s) | SAM Category | SAM Input(s) | SAM Module(s) | SAM Parameter Name(s) | Comment |
2727
|-------------------------------------------------------------------------------------------------------------------------------------------------|--------------------------------------------------------|--------------------------------------------------------------------------------------------------------------|-----------------------------------|--------------------------------------------------------------|---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------|
2828
| `Maximum Total Electricity Generation` | Generation Profile | `Nameplate capacity` | `Singleowner` | `system_capacity` | .. N/A |
29-
| `Utilizaton Factor` | Generation Profile | `Nominal capacity factor` | `Singleowner` | `user_capacity_factor` | .. N/A |
29+
| `Utilization Factor` | Generation Profile | `Nominal capacity factor` | `Singleowner` | `user_capacity_factor` | .. N/A |
3030
| `Net Electricity Generation` | AC Degradation | `Annual AC degradation rate` schedule | `Utilityrate5` | `degradation` | Percentage difference of each year's `Net Electricity Generation` from `Maximum Total Electricity Generation` is input as SAM as the degradation rate schedule in order to match SAM's generation profile to GEOPHIRES |
3131
| `Total Capital Cost` + `Investment Tax Credit Value` + (`Inflation Rate During Construction` × `Total Capital Cost`) | Installation Costs | `Total Installed Cost` | `Singleowner` | `total_installed_cost` | ITC, if present, is added to GEOPHIRES total capital cost since SAM handles ITC credits in cash flow analysis. Inflation during construction is treated as an indirect EPC capital cost percentage. |
3232
| `Total O&M Cost`, `Inflation Rate` | Operating Costs | `Fixed operating cost`, `Escalation rate` set to `Inflation Rate` × -1 | `Singleowner` | `om_fixed`, `om_fixed_escal` | .. N/A |