document example14_data-center CAPEX-only add-on in description
1 parent 7a1dfd5 commit e7227d5

1 file changed

Lines changed: 2 additions & 1 deletion

File tree

tests/examples/example14_data-center.txt

Lines changed: 2 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -3,7 +3,8 @@
33
# This example models a 1 GWe Enhanced Geothermal System (EGS) to power a hyperscale data center.
44
# Based on the techno-economic analysis by Project InnerSpace (Yusifov & Enriquez, 2025), the simulation incorporates direct
55
# cooling via an absorption chiller, yielding an estimated $107 million in annual operating cost savings over the 30-year project lifespan.
6-
# The absorption chiller is modeled as cogenerated heat, with heat sales yielding revenue equivalent to the estimated savings.
6+
# The absorption chiller is thermodynamically modeled as cogenerated heat, with heat sales yielding revenue equivalent to the estimated savings.
7+
# The absorption chiller CAPEX of $562M is modeled via an add-on.
78
#
89
# Reference: Yusifov, M., & Enriquez, N. (2025, July). From Core to Code: Powering the AI Revolution with Geothermal Energy. Project InnerSpace & Future Ventures. https://projectinnerspace.org/resources/Powering-the-AI-Revolution.pdf