Fervo_Project_Cape-4 multilaterals#80
Closed
softwareengineerprogrammer wants to merge 9 commits into
Closed
Conversation
…well when max number of allowed wells)
…ertical and horizontal costs are lumped for better result clarity. TODO to investigate using a deviated drilling correlation to possibly 'better' represent costs
…ling_and_completion_costs_per_well in Economics
Owner
Author
|
Rebased and closed in favor of #81 |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Number of Multilateralsto zero with comment: "This parameter is set to 0 because, for this case study, the cost of horizontal drilling (which would otherwise account for approximately 118 multilateral sections) is included within the 'vertical drilling cost.' This approach allows us to more directly convey the overall well drilling and completion cost, which is under $4 million." https://github.com/softwareengineerprogrammer/GEOPHIRES/pull/80/files#diff-4c74f5cca6c379d27c945d138d703e4ef20d0abb1cd07282659e5b336e45ce2dR79Number of Multilateral Sections: https://github.com/softwareengineerprogrammer/GEOPHIRES/pull/80/files#diff-3d85ef79807fc6c25a758a698fd3a7095750bd27ea52341700e1dad94885b5f6R950Drilling and completion costs per well: https://github.com/softwareengineerprogrammer/GEOPHIRES/pull/80/files#diff-297987ad3d14c84ee6385298fa35b4691491b3cf35c15c45c23a1ea23b01c3ccR336