Skip to content

[pull] master from ruby:master #359

[pull] master from ruby:master

[pull] master from ruby:master #359

Triggered via pull request January 9, 2026 11:54
Status Failure
Total duration 1d 23h 49m 38s
Artifacts

test.yml

on: pull_request
ruby-versions  /  Generate Ruby versions
4s
ruby-versions / Generate Ruby versions
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (truffleruby-head, macos-latest)
Process completed with exit code 1.
test (jruby-head, ubuntu-latest)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
test (truffleruby-head, ubuntu-latest)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
test (4.0, ubuntu-latest)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
test (head, ubuntu-latest)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s