Skip to content

refactor: remove testcontainers-java-tarantool lib #103

refactor: remove testcontainers-java-tarantool lib

refactor: remove testcontainers-java-tarantool lib #103

Triggered via pull request February 4, 2026 06:29
@Alex-pvlAlex-pvl
synchronize #50
TNTP-5930
Status Cancelled
Total duration 17m 57s
Artifacts

tests.yml

on: pull_request
Matrix: tests-box-integration
Matrix: tests-crud-integration
Fit to window
Zoom out
Zoom in

Annotations

7 errors
tests-box-integration (2.11.8-ubuntu20.04)
Process completed with exit code 1.
tests-box-integration (3.0.1-old)
Process completed with exit code 1.
tests-crud-integration (2.11.8-ubuntu20.04)
Canceling since a higher priority waiting request for Tests-refs/pull/50/merge exists
tests-crud-integration (2.11.8-ubuntu20.04)
The operation was canceled.
tests-crud-integration (3.0.1-old)
Canceling since a higher priority waiting request for Tests-refs/pull/50/merge exists
tests-crud-integration (3.0.1-old)
The operation was canceled.
Tests
Canceling since a higher priority waiting request for Tests-refs/pull/50/merge exists