Skip to content

chore(release): prepare release 1.7.0 #330

chore(release): prepare release 1.7.0

chore(release): prepare release 1.7.0 #330

Triggered via push June 29, 2026 14:41
Status Cancelled
Total duration 18m 47s
Artifacts

tests.yml

on: push
Matrix: tests-box-integration
Matrix: tests-crud-integration
Fit to window
Zoom out
Zoom in

Annotations

6 errors
tests-box-integration (2.11.8-ubuntu20.04)
Process completed with exit code 1.
tests-crud-integration (2.11.8-ubuntu20.04)
Canceling since a higher priority waiting request for Tests-refs/heads/master exists
tests-crud-integration (2.11.8-ubuntu20.04)
The operation was canceled.
Tests
Canceling since a higher priority waiting request for Tests-refs/heads/master exists
tests-crud-integration (3.5.0)
Canceling since a higher priority waiting request for Tests-refs/heads/master exists
tests-crud-integration (3.5.0)
The operation was canceled.