Skip to content

Revert "chore: Use GHE fro github enterprise instead of second"#2710

Merged
zakisk merged 1 commit into
mainfrom
revert-2707-change-second-to-ghe
Apr 28, 2026
Merged

Revert "chore: Use GHE fro github enterprise instead of second"#2710
zakisk merged 1 commit into
mainfrom
revert-2707-change-second-to-ghe

Revert "chore: Use GHE fro github enterprise instead of second"

3a400d9
Select commit
Loading
Failed to load commit list.
Pipelines as Code / Pipelines as Code Dogfooding CI / linters cancelled Apr 28, 2026 in 1m 0s

Cancelled

Pipelines as Code Dogfooding CI/linters has been cancelled.

Details


Task Statuses:

StatusDurationName
🔴 Failed 58 seconds

linters


Failure snippet:

task linters has the status "TaskRunCancelled":
TaskRun "linters-pxfs9-linters" was cancelled. TaskRun cancelled as the PipelineRun it belongs to has been cancelled.