- Product: OpenInvoice
- Phase: 0A - Project Discovery and Governance
- Baseline: 0.1.0-draft
- Approval authority: Human Architecture Owner / Final Approver
- Confirm the authoritative repository destination is correct.
- Review destination Git status before applying files.
- Confirm the update ZIP contains no
.git, database, credential, cache, build, or IDE-state files. - Confirm all package paths are repository-relative.
- Confirm no existing unrelated file will be overwritten without review.
- Compare
FILE_MANIFEST.jsonagainst package contents.
- Product name is OpenInvoice everywhere.
- Project purpose and business problem are acceptable.
- Target personas and user journeys are suitable hypotheses.
- Version 1 scope exclusions are reviewed.
- Product-name/legal risk is acknowledged.
- Workspace isolation and data ownership rules are accepted.
- Durable execution, idempotency, and reconciliation rules are accepted.
- Secret-handling rules are accepted.
- UI/application/provider boundaries are accepted.
- AI authority restrictions are accepted.
- Human approval authority is correct.
- Architecture change control through ACR is accepted.
- Approved requirements match prior architecture direction.
- Proposed requirements are not treated as commitments.
- Constraints and assumptions are accurate.
- Open questions have appropriate owners.
- Requirement statuses requiring changes are recorded.
- Workspace, Run, Job, and Attempt remain separate.
- Hybrid
control.dbplus workspace database direction is accepted as draft architecture. - Global bounded execution and workspace logical queues are accepted.
- Provider capability model is accepted.
- Immutable run snapshots are accepted.
- Architecture invariants are suitable for future automated checks.
- No unvalidated numerical benchmark is presented as approved.
- Required Phase 0B spikes cover major risks.
- Risk probability, impact, owner, and status are reasonable.
- No mitigation is falsely marked complete.
- Accessibility and packaging uncertainties are acknowledged.
- Required documents are non-empty and useful.
- Stable IDs are unique.
- Relative links resolve.
- YAML and JSON parse successfully.
- No unresolved merge markers exist.
- No production code or dependencies are included.
- No credential values or sensitive data are included.
- Changes requested
- Phase 0A approved
- Phase 0A blocked
Record explicit decisions, required changes, and approved requirement-status adjustments here during human review.
- Decision: Phase 0A Approved
- Approval date: 2026-07-23
- Architecture change: No
- ACR required: No
- Phase 0B execution: Authorized
- Complete production baseline: Draft pending Phase 0B evidence and Phase 0C approval