Skip to content

Nit CI styling

Nit CI styling #3873

Triggered via push April 15, 2026 16:33
Status Failure
Total duration 1m 48s
Artifacts

cross-sve.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
clang 20 - Arm SVE256
Process completed with exit code 1.
clang 20 - Arm SVE128
The strategy configuration was canceled because "build._256_clang_20" failed
gcc 14 - Arm SVE128
The strategy configuration was canceled because "build._256_clang_20" failed
gcc 14 - Arm SVE512
The strategy configuration was canceled because "build._256_clang_20" failed
clang 20 - Arm SVE512
The strategy configuration was canceled because "build._256_clang_20" failed
gcc 14 - Arm SVE256
The strategy configuration was canceled because "build._256_clang_20" failed